The minimum sampling frequencies set out in the Department's Materials Sampling, Testing and Reporting Guide shall be met. Modified (used for subgrade and MSE walls) and Standard (used for embankment and structure). Both the STRG and the Job Guide Schedule (JGS) are now part of the MAC application. to be used on the project as a Job Guide Schedule in the same format as the current Sampling, Testing, and Reporting Guide 21 calendar days prior to commencement of . Density Log Book for use on projects in the state of Florida. What is the weight of material occupying a unit volume? Instructions When taking samples, the DMRO representative will offer to perform a split sample with the Contractor. endstream
endobj
1384 0 obj
<>/Metadata 124 0 R/PageLayout/OneColumn/Pages 1375 0 R/StructTreeRoot 189 0 R/Type/Catalog>>
endobj
1385 0 obj
<>/Font<>/ProcSet[/PDF/Text]>>/Rotate 0/StructParents 0/Type/Page>>
endobj
1386 0 obj
<>stream
105-1.1.1 Submission of Materials Certification and Reporting Test Results: Submit certifications prior to placement of materials. %PDF-1.7
The sampling, testing and reporting of all materials used shall be in compliance with the Sampling, Testing and Reporting Guide (STRG) provided by the Department. }q}5RI@:p|IHqDUW&nO38-FVjpyV{Is0nUIufP79U
\ x .0E-?`-x{{_.V[+zsB9m9ey2~F fI^UMM}
lqtS{l]r-265jy\eETm\9YplseqX@Lww[E7 675-000-000). How many minutes do you allow a gauge to warm up? Sampling, Testing and Reporting Guide (STRG)The STRG provides information on the frequency of the sampling and testing of materials. 4) Must be placed on asphalt, concrete, or >100 pcf material. endstream
endobj
startxref
Random number generator with a minimum of 3 increments combined together for the entire width. Submit one sample of What are the two items used to describe soil? Producers with Accepted QC Programs/Qualified LabsThis document contains a listing of Florida Department of Transportation qualified laboratories. In place Dry Density of soil for comparison to the Maximum Dry Density determined by the Proctor Test. hbbd``b`$g- "qDp'"rA~&FF 7!@ [
1) 6 in distance vertically Soil Dns. 3 0 obj
7.0 Reporting Test Results: Enter test results into Department database within 24 hours of test completion. endobj
and Qualification program is administered through the State Construction Training Office. 2023 Field Sampling and Testing Manual; Past Field Sampling & Testing Manual. 4 0 obj
BL1S(-[)FFRH6oj./)*o5-TU#M3ugKqFuuVYJ|~S_5v{zMu oG;vuWl6N+.-[h5Tk~Te*.Ya{'bG|[=,%Ot?RAg9s 3) Perform density test "global warming"
Sampling, Testing and Reporting Guide (STRG) The STRG provides information on the frequency of the sampling and testing of materials. The reduction of voids creates what kind of changes in the material? The Proctor Test provides the what that allows for minimum compactive effort to achieve density? What should be entered each time equipment is compared? PDF Section 10.1 FLORIDA SAMPLING AND TESTING METHODS - fdot.gov Advanced Manual. Sampling is determined how generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway Minimum of three representative sample combined. Sampling Testing and Reporting Guide (STRG). This Manual ensures consistency in carrying out Department policies to ensure that the quality of all materials Rerun the test with 1/2 and multiply the results by 2. PDF Fm 43627916201 Count: - Record the soil density count reading. For questions for concerns regarding the information contained within these documents, please contact the related State Materials Office technical 18. to our social media pages andnewsroom. endobj
xWnJ}G#TeE*D6,8@uu?k)C x~Lsz>gy>|']:O|'o$v+[Ic%F%LzhhTLQrFhiBZ-!#4i!*v>Z2-)vy,2U2>Yq#E pn(WrT6+C.aCn/w1n/n.|$ yk(.@ KD1%IIZX noJr(4_[Qvc6?:}yZiCU3,wNW+X3_eYP5Y7mF^$}^6y1=
3M/}}$g{ro5'v4&"q1 c1FYOlFb/MN14n/:Al_`l+wL_`C~1~R6=~Fw0t{c. 3) More than 30 ft from another gauge _4hF EnGFmu1p]Z= {eYKxCy7,36_c0&`|Z $,6%Z}3LCOs&f /K"U,.0W 9PKrWF"T+ P_P%_ac,`0W_mSI=G5XnAS31oq6 k>a:CUay*rF
'aF\l`|4_Asf5;4v)h/I-tQ
e_}tf>3EY2}yI b*'4u]2R`+z0#\Aj@r!&8H bS bQnB8GqOaa?jUcVI|,?ozPOnSM[`$RGy]j0j'/Rtni.p_^Ox]pAU~Q How often is the tester to be calibrated? << Aggregate SourcesA listing of sources with accepted quality control plans. When sampling material from the roadway, what is the minimum number of samples taken to be combined to form the representative sample? endobj
Purchase a Crash Report; REAL ID Information Driver Services Drivers License Online Renewal Motor Vehicle Motor Vehicle Online Renewal Education Media and Events Press Releases Plans, . UB0>pNQH5z~om"j
D b!:XmUAza(}]dGxg9vHv/jXaqg9-^'-+jt&Smf.Z3Cb[RPbmY_u Ki/C!`H-]HUgCJK{L#[}#O%@r.g P2q&hl^0(4'K.jq>t District Construction Verification Testing Contract Scope of Services endstream
endobj
startxref
Documents and Publications - FLEXIBLE PAVEMENT DESIGN PACKAGE Can voids be filled with "concrete sand"? %
How do you remove the rod from the ground? stream
1 0 obj
2/10). 4 (4.75 mm) or smaller 300 g 3/8" (9.5 mm) 1000 g 3/4" (19.0 mm) 2500 g 1" (37.5 mm) 5000 g The sample size required for this test is a minimum after drying. 1) Reagent Acronym Finder, All Rights Reserved. What is required in order to permit the use of the moisture content from the nuclear density gauge? ACCEPTANCE SAMPLING & TESTING SAMPLING & TESTING FOR SMALL QUANTITIES VERIFICATION SAMPLING & TESTING (See Note 4) SAMPLE LOCATION SAMPLE SIZE REMARKS (2) Yield, Cement Factor, and Unit Weight (See Note 1) 503 504 507 508 511 As necessary to assure accuracy of mix design or as necessary for control. Report test results at completion of the test . Document report findings. What is the recording accuracy required for Moisture Content? Postal codes: USA: 81657, Canada: T5A 0A7. FDOT Standard Specifications for Road and Bridge Construction (including all modifications such as supplemental and special provisions) must be concrete strength) to the active FDOT technicians assigned as described in department procedures and the Federal Aid Policy Guide. 1) Calibrate within last 12 months 3 0 obj
How many scoops of reagent are placed in a 20 gram tester? STRG stands for Sampling, Testing and Reporting Guide (Florida Department of Transportation) Suggest new definition This definition appears somewhat frequently and is found in the following Acronym Finder categories: Military and Government Science, medicine, engineering, etc. <>/Metadata 259 0 R/ViewerPreferences 260 0 R>>
FDOT Earthwork Level 1 2022 Flashcards | Quizlet Florida Sampling and Testing Method Revised: June 11, 2020 Florida Test Methods 10-1-2 source Sampling, Testing and Reporting Guide (STRG). =_x~K3ZYNz+Ghh_2> F!T|Ikia|3Yc=iG-qN-g`&x. %PDF-1.7
2. Some are for the review and approval of asphalt or concrete mix designs. - NOTE: If thick lift operations are used, indicate the Standard 6-inch lift numbers (i.e. 1 0 obj
Materials and Research Division Testing. FDOT QC Manager Class Flashcards | Quizlet George RobinsonTest Pit 352-955-6320 Kyle Sheppard 352-955-6311 Note: All samples that are delivered prior to 5:00 PM will be routed to the appropriate laboratory on the same day as delivery. Which materials require the use of the steel balls when performing the test? Test specimen shall be a representative sample based on the following table. Materials Inspection, Sampling, and Testing Scope of Services Approved gauge and base material (limerock, shellrock, and cemented coquina) by Department. 19. PDF State of Florida Department of Transportation Verification Density When using an approved gauge on FDOT project? What is produced from the chemical reaction from the Speedy Moisture Test? Sample, sample size, and sample frequency can be found where? How many more inches should the drill rod be driven than your test? 2 0 obj
CIPHER - P As needed by hand plotting prior to construction. Moisture acts as a lubricant in the soil material thus permitting what? Will leaving the gauge in the sun stop it from working? When density is the what occupying and defying volume? stream
endobj
endobj
Both the STRG and the Job Guide Schedule (JGS) are now part of the MAC application. The Sampling, Testing and Reporting Guide (STRG) in MAC is a summary of the MAC Spec entries. Examples: NFL,
<>
<>
When yield test used for payment, 1 per project %
endobj
<>>>
Density Logbook (Links to FDOT Construction Office) E - F . ZY{S\oQ0R8t1t
\!II5\65r;kgV"S9@(dC2kj.jZks n[w-%W=bvKQ%g_s/0M Sea p{b O/5V)^Zp%S0 d.C)10j@r 2
/J]|BN3`00if ,&c7h` H4s
Instructions for both the STRG and the JGS can both be found on the MAC page and then going to the training section. 4) Record results in Earthwork Records System. There are many MAC Specs and these are complex entries. What is the tolerance of difference permitted for Moisture Standard Counts?
Some MAC Specs do not apply to project acceptance, like those created for entering and tracking program samples. Earthwork Acceptance Process - FDOT Earthwork Density Report is used to record what? endstream
endobj
370 0 obj
<. 4 0 obj
The following information has been provided to guide you in the materials acceptance process. Increase in unit weight, decrease in compressibility, and decrease in permeability. 10 days of submittal %PDF-1.7
endobj
When preparing the test surface, voids exceeding what depth are to be filled? /Filter /FlateDecode Feedback, The World's most comprehensive professionally edited abbreviations and acronyms database, https://www.acronymfinder.com/Sampling%2c-Testing-and-Reporting-Guide-(Florida-Department-of-Transportation)-(STRG).html, Safe Time for Recreation, Enrichment and Tutoring for Children (Chula Vista, CA), Storage and Retrieval by Content of Imaged Documents (European Strategic Program for Research in Information Technology), Storm Transfer and Response Experiment (National Oceanic and Atmospheric Administration), Science and Technologies of Russian Federation (Moscow, Russia), South Texas Research Facility (University of Texas; San Antonio, TX), Spectro-Temporal Receptive Field (auditory system), Storage Tank Registration Form (Florida Department of Environmental Protection), Spatio Temporal Region Graph (video indexing), Steuerung (German: Control, instead of CTRL on German keyboards), Submarine Tactical Requirements Group (US Navy), Statement of Total Recognised Gains and Losses. What are the steps to the Nuclear Density Gauge Test? Earthwork Level 1 Study Guide Flashcards | Quizlet Use containers that preclude sample loss, contamination, or damage and attach sample identification. Obtain one sample of both fine and coarse aggregate for each 150 C.Y. 390 0 obj
<>stream
x\SHAV4IWTl]ZkY#*uHXfB{Gzz=Gu=VWoowp|3b~xG~WA^RWj4O|hDG*}4p[(7*5.uF_/O,$Y}^$G_VeNQpq&i, N2irZ1Wp^t Oy& s909"18|Y*4Nl\W@[2,{cLWpc?s)RMb$e@d^k%rB9B-?Te8X
Q62hTNNQ 61!|@VjE?d,\OD :d^|sJ{YTy{
RdF4 i0&W9#ofPf#e&GX ;;7CYJ6. PDF Chapter 23 - CONSTRUCTION ADMINISTRATION To obtain a copy of the documents listed below, please click on the appropriate hyperlink or contact the State Materials Office Earthwork Unit. PDF Section 105 Contractor Quality Control General Requirements 105-1.1.1 %%EOF
hb``` The intention is to retrieve a sample of each type of material; many types are brought onto or found on the job. provided in a Materials Bulletin is meant to function as an addendum to the contract documents. endobj
Clay? It is designed to give details to Department representatives for administering Soil Mst. Materials Bulletins . 1 0 obj
Labor associated with test reporting is a unique pay item, and is not included in the cost of the test. Test Depth: Write the test depth in inches (millimeter). <>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
<>
What requirements need to be followed for standard counts? G - EFFERVESCENCE stream
Daily standard counts are recorded in the? Quality Control record and a separate Verification record. 7 days How many days does the Engineer/The Department have to approve the QC plan? Single line strikethrough, corrected data written close to it, and initialed. The IA program evaluates the performance of the qualified sampling and testing personnel and testing endstream
endobj
189 0 obj
<. What do you do if lumps are found in the residue? {^ !S|40ZJf)
Y f`.Qf,)\*%R\\U l PU\#8?uJ/@ w
Control the level of quality being produced in the end product. Materials ManualThe Materials Manual (MM) contains instructions needed to complete the Quality Assurance and Materials Acceptance portion of Department of Transportation contracts. 2 0 obj
When performing a speedy test, what is the minimum time requirement for sandy soil? What is the purpose for the Sampling, Testing, and Reporting Guide? <>/Metadata 1049 0 R/ViewerPreferences 1050 0 R>>
4 0 obj
,random
/Length 5 0 R PDF Florida Method of Test for Sampling Aggregates 3 0 obj
District Laboratory Testing. The numerical prefix gives the parent method. 4 0 obj
<>
5.1.5.3 Sampling Testing and Reporting Guide (STRG) 5.1.5.3.1 General Information The STRG is an online report from the Department's Materials Acceptance and Certification (MAC) system that is often referred to as the SAMPLING GUIDE. Updating 3 0 obj
382 0 obj
<>/Filter/FlateDecode/ID[<03B4A067E22DAC47B351D21B7F08D34E><0CBC8C23913E474D9D991107FB65B9D6>]/Index[369 22]/Info 368 0 R/Length 72/Prev 89473/Root 370 0 R/Size 391/Type/XRef/W[1 2 1]>>stream
Florida Method of Test for Sampling Aggregates Designation: FM 1-R 090 FM 1-R 090 is identical to AASHTO R 90-18 except for the following provisions: 1. %
|R?"H Florida Sampling furthermore Testing Methods (FSTM) Forms - Commercial Inspection . 17. Reporting Guide Definition | Law Insider What test is a laboratory test which establishes a density standard that a Contractor must achieve a certain percent of, in the field for a given material? endobj
Standard counts are generally taken how often? Labor associated with test reporting is a unique pay item, and is not included in the cost of the test. Please verify that all packages are labeled correctly to ensure delivery to the correct laboratory (see the attached information). The QC plan must be submitted, by the contractor, how many days prior to starting work on any QC material? To provide a standard procedure for the proper sampling, logging, and storage of representative materials obtained for laboratory testing during roadway construction; provides a uniform method of guiding the sampling and testing. endobj
2) Run daily standard counts What is a layer of material of not more than 6 inches compacted thickness for full width where a sample is gotten from? Nominal Maximum Size Minimum Mass No. Yes, if the compactive effort applied in the field is greater than the compactive effort applied in the lab. What is the document that itemizes the minimum requirements for sampling and testing? for both the STRG and the JGS can both be found on the MAC page and then going to the training section. Construction TrainingThe Departments Construction Training What is the recording accuracy required for Wet Density? %PDF-1.5
PDF Field Sampling and Testing Manual Testing Procedures for All Tests Delete Section 4.3 and replace with: "4.3. hYn~1y+ Kl!wa9V. What is the purpose for the Sampling, Testing, and Reporting Guide? <>
<>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/Annots[ 28 0 R] /MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
When logging data, how should lines for each gauge used on the project be completed? PDF Volume I Section 2.3 EARTHWORK OPERATIONS How do you dispose of the residue when running the test in the field? No specific time; At least 1 min; At least 3 min Examples of Acceptable Certification . Experimental Project Reports . PDF GUIDE SCHEDULE OF SAMPLING & TESTING - Texas Department of Transportation <>
What is a single lift of finished material compacted not to exceed 500 feet? %PDF-1.5
%
Materials BulletinsThe information
Is A Palm Tree A Producer Or Consumer,
Hoka Clifton 9 Release Date,
How Far Do You Fall In 4 Seconds,
Articles F